Packing a terrace down for winter takes four hours and saves a season
Clean, dry, oil, stack, cover with airflow. Skip the dry step and the finish blooms.
The order that matters
Clean, then dry for 48 hours indoors, then oil, then stack. Oiling a damp frame traps water under the coat and it comes back as white bloom in March.
The wet-season failure itself is in terrace rain and runoff, and packing is the prevention.
The stack
Stacked outdoors under a cover is a humidity box. Stacked indoors with a 100 mm gap to the wall and a breathable cover is fine. Twelve high is the limit for a 1.2–1.5 mm frame; above that the bottom chair takes the load.
Powder damage from the season gets touched in before storage — see powder touch up on site.
The inventory
Count on the way in, not on the way out. The terrace that opens in April with 8 of 60 chairs missing is a purchasing problem discovered at the worst moment.
This is in the rooms guide, with packaging engineering as the note on how they arrive in the first place.
Chairs that come in for winter are on hotel dining chairs, and the tops that stay out are on hotel dining tables.