Clamping time, and the afternoon that ruins it
A joint taken out of the press at twenty minutes and machined the same day will open in the first dry week.
The two clocks
45–60 minutes in the press, 24 hours before machining the joint. Those are different clocks: the clamp holds the joint while the glue sets enough not to move, and the cure continues for a day while the joint gains full strength.
Machining between the two is what breaks joints. The cutter vibrates a joint that is holding but not yet strong, and the micro-cracks that form never close.
Why it happens anyway
Because the schedule is tight and the parts are needed downstream. The factory running a same-day flow will clamp in the morning, machine at noon and finish on Thursday, and the chairs will pass inspection and fail in service.
The fix is a drying rack and a day of buffer, which costs floor space rather than money. Frames given that buffer are on hotel dining chairs.
What to ask
Ask how long a glued frame sits before machining. Twenty-four hours is the answer that means the factory has the space; two hours means it has the schedule and not the space.
The chemistry is in the joinery guide, next to glue line thickness and glue types and where they fail.
Knock-down frames avoid the question and are under hotel dining tables.