Shipping a finish before it cures
A lacquered frame packed on the day it was sprayed arrives with the carton printed into the surface.
Why it happens
The two-pack finish is touch-dry in hours and fully cured in days. Packing between the two traps solvent under the wrapping, and the foam or corrugated board presses into a soft film.
two-pack polyurethane, 3 coats, 30–40 micron dry film, 24 h between coats — and the cure continues for 48 hours after the last coat.
What the schedule needs
Two days between the last coat and packing, in a warm room. The factory that packs on the same day saves two days and produces a finish that never hardens properly.
Frames with the cure built into the schedule are on the hotel dining chairs range.
The sign on delivery
Carton print on a top, a soft or tacky feel under the wrapping, and a smell that lingers after unpacking. All three mean the same thing.
This is in the finishing guide, with moisture in a freshly sprayed part and UV cured finishes as the two notes that follow.
Tops are the slowest to cure and are on the hotel dining tables page.