Craft Notes
Home · Specifying

The eight columns a furniture schedule needs

Quantity, size, seat height, species, seat build, cover, finish, room. Everything else is prose.

12 Dec 2026 · Specifying
The guide behind thisThe specification guide: how to write a schedule a supplier can price — One line per model, four dimensions, two materials and a finish code. The rest is a drawing, not a sentence.

Why columns and not sentences

The row per model with the same columns forces the writer to commit. "A light contract chair in warm timber with a soft seat" is priced by guessing, and the guess is the cheapest reading that satisfies the words.

The dimensions that carry the most weight are tabulated in the four dimensions on a drawing.

The ones people leave out

Seat construction. Without it, a 35 kg/m³ cut foam and a 45 kg/m³ moulded seat read as the same line and differ by 12% on price. Second omission: the room the piece goes in, which is what tells a supplier the duty cycle.

The schedule written this way prices against hotel dining chairs in a day, not a week.

The test

Hand the schedule to someone who has not seen the project. If they can describe the chair to a third person, it is finished. If they ask a question, the answer belongs in a column.

This is the first section of the specification guide, with drawing format a factory can read and room by room schedule format as the two notes that follow.

The schedule written in this format is priced against the range on hotel dining chairs.