Craft Notes
Home · Specifying

Specifying

Drawings, schedules, tolerances and samples a supplier can actually price.

Read the the specification guide: how to write a schedule a supplier can price first — it holds the numbers these notes work from.

Colour approved on a swatch is not colour approved on a chair

A 60 mm swatch reads darker than a 500 mm chair back. Approve on the piece, in…

A drawing a factory can read has three views and no shading

Front, side, plan. Dimensions on the view that shows them. No…

The one line that describes a seat

35–45 kg/m³ foam, 40–50 mm thick, 40,000 Martindale cover. Three numbers and a…

A finish named as a colour will be matched to a photograph

Name the system, the sheen and the number of coats. Warm oak is not a…

Frame sample or full sample, and what each one proves

The frame proves the geometry. The full sample proves the colour and the…

Hardware is 4% of the price and 40% of the complaints

Glides, bolts, inserts, feet. Name them or get whatever is in the bin that…

Hole centres are the one dimension that cannot be fixed later

0.5 mm off across a knock-down frame and the table racks, every time it is…

One room, built first, before 200 chairs

Ten of each model, one room, one week of real service. Cheaper than a change…

The spares line nobody puts on the schedule

5% extra chairs and 10% extra fabric. Both cost less than one emergency…

A 3 mm radius on a drawing is a 5 mm radius in production

Cutter wear opens every fillet. Say the range, not the…

Two versions of one drawing is a defect waiting

Rev A on the factory floor and Rev B in the buyer's inbox builds the wrong chair,…

The roll number is the cheapest insurance in the project

One line on the purchase order, and a re-cover in year three still…

Group the schedule by room, not by model

The same chair in two rooms is two rows. The duty cycle is what…

Six things to check before signing a sample

Once it is signed, the sample is the contract. Photograph it from four angles on the…

The eight columns a furniture schedule needs

Quantity, size, seat height, species, seat build, cover, finish, room. Everything else is…

Seat height on a drawing is ambiguous nine times in ten

Bare frame or compressed? The 30 mm difference is the whole…

A rendering sells the chair, a section builds it

The section shows the 18 mm rail behind the 40 mm face. The rendering shows…

Who draws the shop drawing, and why it matters

The design drawing says what it looks like. The shop drawing says how it is…

Which test, at which level, on how many samples

EN 16139 level 2 is not the same as tested to EN 16139. Write the…

Four dimensions that decide if a chair is a contract chair

Overall height, overall width, seat height, seat depth. The last two are the ones that go…

A tolerance budget is a price, not a standard

±1 mm everywhere costs 15% more. On the three interfaces that matter, it is worth…

Millimetres, one scale, and no scaling off the sheet

A dimension missing from a drawing will be scaled with a ruler. Then it will be…

Upholstery has four lines, not one

Cover, foam, pan, seam. Leave any of them out and the supplier picks the…

Weight and stack height belong on the schedule

Both are operational numbers, and both are invisible until the room…

What ±2 mm actually covers

It is a band on the finished part, measured cold, on a flat surface, with the part…