What a factory can actually make in a month

A capacity figure without a mix is a number with no meaning. 20,000 chairs is not 20,000 of your chair.

23 Nov 2026 · Workshop
The guide behind thisThe workshop guide: kiln, jigs, QC and packing — The five checks that catch a bad batch before it ships, and the order the work actually moves through a furniture factory.

Why the mix matters

Capacity is set by the slowest stage, which is finishing. The factory can machine 5,000 chairs and finish 1,200 if each one needs three coats and a day of cure.

So a mixed order of chairs, tables and booth runs consumes capacity at very different rates.

What to ask

How many of this model, in this finish, in a month, with the current order book. That question gets a real answer; a total capacity figure gets a brochure.

The lines that set the number are described under hotel furniture factory, and the models on hotel dining chairs.

Planning around it

Split large orders into two shipments a month apart so the second one uses the next month's capacity instead of queueing behind the first.

This is in the workshop guide, next to production slots and booking and kiln capacity and scheduling.

Tables compete for the same finishing line — see hotel dining tables.