Craft Notes
Home · Workshop

Workshop

Kilns, jigs, QC stations and the checks that catch a bad batch.

Read the the workshop guide: kiln, jigs, qc and packing first — it holds the numbers these notes work from.

What a factory can actually make in a month

A capacity figure without a mix is a number with no meaning. 20,000 chairs is not 20,000 of your…

CNC or hand work, by part

A CNC makes a straight part repeatable. A hand cutter makes a curved part possible at…

Loading a container, and the carton left on the dock

Shortages are almost never lost at sea. They are counted wrong at the…

A full container or a shared one

LCL is cheaper per cubic metre until the damage and the delay are added to…

A drawing a factory can read

Three views, four dimensions and a material callout beats a rendered image with a mood…

Factory or trading company

Both can be the right supplier. The mistake is thinking you are buying from one and getting the…

First article inspection, and why it saves a batch

One chair checked fully before 200 are made is the cheapest quality control in the…

How a furniture quotation is built

Frame, upholstery, finish, packing. Two quotes 20% apart are almost never a pricing…

Jigs, and the 3 mm drift between the first and last chair

Without a jig, a leg is drilled where the operator marked it. With one, the 200th chair has the same hole as…

Kiln capacity is the real production limit

A factory can machine faster than it can dry. That is why the date slips without anyone being…

The bottleneck is never the machine, it is the queue in front of it

A 25-day lead time is four days of work and twenty-one days of waiting, in the wrong…

A blunt cutter shows in every joint

Tooling wear is invisible on the machine and obvious on the part: torn grain, a lifted shoulder, a burn…

Packaging engineered for one trip

A carton has to survive four thousand kilometres, two crane lifts and a humid container. Test it or guess…

Packing is the last chance to avoid a claim

Most transit damage is decided in thirty seconds by how a corner was…

Progress photographs, and what they prove

A photograph of a stack of frames proves the frames exist. It does not prove they are…

Pre-shipment inspection, and who pays for it

A third-party inspector at the factory sees what a photograph from the sales team never…

Production slots, and why your order has a date before it starts

An order sits in a queue from the day the deposit clears, not from the day the drawing is…

Four QC stations and what each one catches

Quality control is a set of gates, not a person at the end of the…

Where the timber waits matters

Dry timber stored in a humid shed goes back to the moisture it was dried out…

Sanding is where a finish is decided

No finish is better than the surface under it, and the surface is decided by grit sequence, not by…

Two shifts or one, and what it does to quality

A second shift adds capacity and removes the person who was checking. That trade shows up in the…

A spray booth is a clean room

Dust in the air is dust in the film, and a 0.1 mm speck is visible on a satin…

What a factory subcontracts

Almost every factory sends something out. The question is what, and whether anyone checks it on…

Offcuts, and where the yield goes

A chair frame uses about half the timber that arrives at the machine. The other half is the price you are…

Skill shows in the parts nobody measures

Two factories with the same machines produce different chairs, and the difference is who is holding the…