Frame sample or full sample, and what each one proves
The frame proves the geometry. The full sample proves the colour and the seat.
The frame
7–10 days for a frame, 12–15 with cover and finish A bare frame shows the joints, the seat rail depth and the leg splay. It does not show the colour, the seam or the feel.
What the joints have to prove is in sample sign off checklist, because a frame sample that passes is signed on the joints only.
The full sample
Cover, foam, finish, hardware. This is the one buyers skip and the one that prevents a colour argument. It also confirms the seat feel, which no drawing carries.
Full samples of the range are on contract dining chairs, and the seat build is in upholstery line on a schedule.
The order of events
Frame first, approve, then full sample. Doing them in parallel saves a week and loses the chance to change the joint before the cover hides it.
This is in the specification guide, with sample sign off checklist as the note on the second stage.
Both sample stages are quoted with the order, and the range they come from is on hotel dining chairs.