Craft Notes
Home · Workshop

Why a small batch costs more per chair than the wood

Jigs are set once per shape. The first chair in a batch pays for the setup and the last one rides on it.

25 Nov 2026 · Workshop
The guide behind thisThe workshop guide: kiln, jigs, QC and packing — The five checks that catch a bad batch before it ships, and the order the work actually moves through a furniture factory.

Setup is a fixed cost

Every frame shape needs its jigs squared and pinned before the first cut. On a side chair that is about 90 minutes: drill plate, welding jig and the seat deck pattern. Ninety minutes does not change with quantity, so 20 chairs carry 4.5 minutes each and 200 chairs carry 27 seconds.

This is the whole argument behind batch size, and it is why the price per chair falls between 50 and 150 pieces without anything else about the chair changing.

Where the jigs come from

Jigs are cut from the drawing, not from the sample. The sample made without a jig is a one-off and the line has to be tooled again when the order arrives. Asking whether the sample was jigged tells you what the production run will look like.

Tooling for a new shape takes three to four days in our workshop, and the jigs stay on the shelf for repeat orders. The tooling approach is set out in jigs and tooling and the first-off check in first article inspection.

What a small batch should do instead

Below about 30 chairs, the cheaper route is usually an existing frame with a different cover and finish rather than a new shape. The frame is already jigged, so the order pays for materials and upholstery only.

Where the shape has to be new, put the quantity on the drawing and let the batch size be decided before tooling. The rest of the sequence sits in the making guide. The tooled side chair frames are listed under hotel dining chairs, and the workshop that cuts them is described under hotel furniture factory.