The note that says match existing, and what it measures

Match existing is a note, not a dimension. What it leaves to the factory is a decision the drawing was supposed to make.

25 Nov 2026 · Specifying
The guide behind thisThe specification guide: how to write a schedule a supplier can price — One line per model, four dimensions, two materials and a finish code. The rest is a drawing, not a sentence.

Three jobs under one note

Under the words sit three different jobs: same species and finish as the frame already on site, same overall size so a new run lines up with the old one, or same colour as the top the client points at. Each is measured differently, and only one of them can be settled from a photograph.

The frame has also moved. Beech at 10 per cent moisture shrinks about 1.5 mm across a 90 mm seat rail, so existing is not the same as the drawing it was made from six years ago.

Measure the object, not the file

Six figures per chair cover it: overall height, seat height, seat width at the front rail, overall depth, back height above the seat, and the section of the front leg. Measure three chairs from three rooms and take the middle reading for each, then write plus or minus 2 mm against every one of them.

Colour is a separate job. The existing finish has aged two to four shades warm, and a chip matched to the frame on site in daylight reads wrong under 3,000 K downlights at eight in the evening.

What the factory needs to price it

Bring a physical sample of the existing finish where colour has to follow, and say which figure wins when the new chairs and the old ones disagree. Tolerance in a mixed room is tighter than in a new one, 2 mm rather than 5, because the eye compares neighbouring chairs rather than the whole room.

Colour approval is set out in colour approved on a swatch, and the rest of the sign-off in six checks before signing a sample.

The line to write instead

Replace the note with a measured schedule: the six figures, the tolerance, the colour reference including the light it was judged under, and the date of the site visit that produced them. That is a page a factory can price, and the same page settles the argument in month nine.

Drawing conventions for the rest of the schedule are in the specifying guide. Tables for a mixed room are listed under hotel dining tables, and the workshop that builds both is described under hotel furniture factory.