Craft Notes
Home · Workshop

Four QC stations and what each one catches

Quality control is a set of gates, not a person at the end of the line.

21 Nov 2026 · Workshop
The guide behind thisThe workshop guide: kiln, jigs, QC and packing — The five checks that catch a bad batch before it ships, and the order the work actually moves through a furniture factory.

The four gates

Incoming timber: moisture and defects. After machining: mortise depth and hole position. After upholstery: cover tension and seam placement. Before packing: the frame under load and the finish under a light.

Each gate catches what the next one cannot see. By packing, a hole position is hidden under a seat.

Where it fails

When one gate is skipped on a busy week and nobody notices until the container is sealed. The record of the checks, not the checks themselves, is what keeps them happening.

Frames from a line with all four gates are on hotel dining chairs, and the booth runs under booth seating.

What to ask for

The check sheet for your order, signed, with the counts. The factory that cannot produce one has the stations and not the system.

This is in the workshop guide, with first article inspection and pre-shipment inspection as the related notes.

Tops have their own gate for flatness — see hotel dining tables.