Craft Notes
Home · Buying

Batch the finish, not the model

Three models in one colour is one booth run. Three colours is three, and the third costs most.

24 Dec 2026 · Buying
The guide behind thisThe buying guide: quotations, minimums, lead time and inspection — What a furniture quotation is made of, why a minimum exists, what moves a date, and the four documents that decide a claim.

The booth

The spray booth run has a setup: masking, mixing, gun cleaning, and a cure window. two-pack polyurethane, 3 coats, 30–40 micron dry film, 24 h between coats That setup is charged whether it covers 6 pieces or 60.

The minimum logic is in minimum order quantity, and the colour control is in tinting and colour matching.

The saving

Three models, one colour, one run. Moving a third colour to the next production slot saves the booth setup and keeps the piece price at the 60-piece level.

Ranges that share a finish are on hotel dining chairs, and the table side on hotel dining tables.

The risk

One colour across three models means one colour error across three models. That is why the 300 mm panel approval in the specification matters more, not less, on a batched order.

This is in the buying guide, with price difference between two quotes as the note on what a second colour really costs.

Batching works best across a family of models rather than one, and the table family is on hotel dining tables.