The buying guide: quotations, minimums, lead time and inspection
What a furniture quotation is made of, why a minimum exists, what moves a date, and the four documents that decide a claim.
How a price is built
Frame 35–45% of FOB, upholstery 20–30%, finish 10–15%, packing 3–4%. That split is the same in every factory, which is why two quotations 20% apart are almost never a pricing decision — they are a different frame, a different foam or a different finish, described with the same words. Ask for the split, and the difference becomes visible.
6 pcs per line. Below the minimum, the setup time per model is spread over too few pieces, so the factory either refuses or prices the setup in full. Batching finishes is the cheapest way to stay above it.
Lead time, honestly
25–35 days after sample sign-off, in six stages: Drawing and PO 3–5 days, Timber release and cutting 5–7 days, Machining and frame assembly 7–10 days, Upholstery 5–8 days, Finishing and cure 3–5 days, QC and packing 2–3 days. The stage that moves is never the one the buyer asks about. It is the sample, because a sample is a queue behind other people's samples, and it is the finishing line, because cure time cannot be compressed.
Rush orders are real but narrow: splitting a single shipment into two, with the first covering the opening room and the second the rest, pulls the opening date forward without asking anyone to skip a stage. Air freight on 40 chairs is cheaper than a delayed opening; air freight on 400 is not.
Inspection, documents and claims
Four documents decide whether a claim is settled: the signed sample, the packing list with carton counts, the inspection report at the factory, and the photographs taken at unpacking. Without the third, damage in transit and damage in production look identical.
EN 16139 level 2 — 1,600 N on the seat, 560 N on the back. Book it before the container is sealed, not after it lands — a factory can fix a batch, a port cannot. And check the container count against the packing list at the door: shortages are almost always a carton left on the dock, not a carton lost at sea.
Prices and terms for the range are on hotel dining chairs, and the workshop that builds them is described under hotel furniture factory.