Craft Notes
Home · Buying

Buying

Quotations, minimums, lead times, inspection and the terms that bite.

Read the the buying guide: quotations, minimums, lead time and inspection first — it holds the numbers these notes work from.

The annual increase is 3–6%, and it is not a negotiation

Timber, steel, labour and power. Ask for the breakdown, then argue about the timing, not the…

Book the inspection before the container is sealed

A factory can fix a batch. A port cannot. The inspection is worth the flight on the first…

Batch the finish, not the model

Three models in one colour is one booth run. Three colours is three, and the third costs…

Three suppliers, one schedule, and a decision in ten days

Same schedule to all three, same questions, and score the answers rather than the…

What a replacement policy should say, in numbers

Replacement or credit, within how many days, shipped how. Three blanks that decide…

Count the cartons at the door, not at the site

Shortages are almost always a carton left on the dock, and the dock is where you can still prove…

A quote with no validity date is a quote for today only

Timber and steel move. Thirty days is normal, ninety is a gamble the supplier is…

A delivery window is a promise, a lead time is an estimate

Write the window into the order with a consequence attached, or you have…

A video call is not an audit, but it catches the obvious

Ask for the kiln, the jig wall and a random carton opened live. The three that are hard to…

Freight per chair, and why stacking pays for itself

A stacking chair is 0.11 m³, a fixed one 0.15. On 500 chairs that is a container…

Six stages, and the one that moves is never the one you ask about

25–35 days after sign-off. The variable is the sample queue and the cure…

The minimum is not a number, it is a setup cost

6 pcs per line. Below it the jig, the program and the first-article check are spread too…

Six models at six pieces is not a 36-piece order

It is six setups, six first articles and six finish runs. The price reflects…

Thirty percent down, seventy on the bill of lading

Standard, and the balance is the only real leverage. Do not release it before the inspection…

Where the 20% actually sits

Four places: seat foam, frame species, finish coats, packing. Ranked by how much they…

Two quotes 20% apart are never a pricing difference

Same words, different frame, different foam, different finish. Ask for the split and it…

Air freight on 40 chairs is cheaper than a delayed opening

On 400 it is not. The line is around 80 pieces, and it moves with the room…

A second source costs 8% and buys a fallback

Splitting a range across two factories means two colours, two tolerances and two lead…

FOB or CIF changes who owns the risk, not the price

FOB at the port of loading. CIF adds freight and insurance and keeps the risk with you…

Spare parts cost nothing now and everything later

Glides, bolts, a spare cover per ten seats. Ordered with the batch, they arrive in the same…

Four documents decide whether a claim is paid

Signed sample, packing list, factory inspection report, unpacking photographs. Missing one loses the…

What is charged on top of the piece price

Sample, tooling, a colour match, and a logo. Four lines that appear after the quote is…

What an auditor actually looks at in a furniture factory

Not the showroom. The kiln log, the jig wall, the QC sheet and the packing…

Who keeps the signed sample, and why it decides arguments

Two samples, both signed. One stays at the factory, one on site. A single sample is a…

Samples run on someone else's queue

A sample room is 9 people serving every buyer at once. Your sample is behind the last one…