Craft Notes
Home · Buying

Count the cartons at the door, not at the site

Shortages are almost always a carton left on the dock, and the dock is where you can still prove it.

26 Dec 2026 · Buying
The guide behind thisThe buying guide: quotations, minimums, lead time and inspection — What a furniture quotation is made of, why a minimum exists, what moves a date, and the four documents that decide a claim.

The count

Packing list in hand, carton numbers checked against the container manifest as they come out. Two people, one reading, one ticking. Twenty minutes for a 40HQ.

The volumes that make the count predictable are in freight cost per chair — 0.11–0.15 m³ per chair, about 450–550 per 40HQ is the planning number.

Why the door

After the truck leaves, a short carton is indistinguishable from a stolen one. At the door, the manifest is still open and the driver is still there.

Loads that match their manifest come from hotel furniture factory, and the loading process is in container loading and count.

The one that goes missing

It is usually the last carton, loaded by hand after the pallets, and it is usually the hardware box. Count the small ones twice.

This is in the buying guide, with the four claim documents as the note on what to do when the count is short.

The count is easier on a model that stacks square, and those are on stackable banquet chairs.