Craft Notes
Home · Specifying

Hardware is 4% of the price and 40% of the complaints

Glides, bolts, inserts, feet. Name them or get whatever is in the bin that week.

15 Dec 2026 · Specifying
The guide behind thisThe specification guide: how to write a schedule a supplier can price — One line per model, four dimensions, two materials and a finish code. The rest is a drawing, not a sentence.

The list

Glide type and diameter, bolt size and finish, insert type, foot cap, and any fixing for a banquette. 1.2–1.5 mm is a frame number; the hardware has its own.

The floor side of the glide question is in replacing glides.

Why it drifts

Hardware is bought by the box, and a substitute of the same size but a different grade is invisible until it rusts. Naming the grade is the whole specification.

Frames with named hardware are on hotel dining chairs, and the stainless case is in stainless where it is worth it.

The spare box

Order 5% spares of every hardware item and keep them with the furniture. It is the difference between a repair on Tuesday and a repair next month.

This is in the specification guide, with quantity and spares line as the note on how to write it.

Hardware is specified per model rather than per project, and the ranges are on hotel dining chairs.