Craft Notes
Home · Specifying

The spares line nobody puts on the schedule

5% extra chairs and 10% extra fabric. Both cost less than one emergency order.

16 Dec 2026 · Specifying
The guide behind thisThe specification guide: how to write a schedule a supplier can price — One line per model, four dimensions, two materials and a finish code. The rest is a drawing, not a sentence.

The numbers

5% on chairs, 10% on fabric, 5% on hardware, and one spare cover per ten seats. On a 120-chair project that is six chairs and a roll end.

The reason to hold covers is in roll number on the purchase order.

Why 5% and not 2%

The delivery of 120 chairs loses two to transit and finds three that do not suit the room. 5% covers both and keeps the model in production for the spares order.

Quantities ship from hotel dining chairs, and the loading numbers are in container loading and count.

Where it goes

The separate row at the bottom of the schedule, not a footnote. The row gets ordered; a footnote gets negotiated away.

This is in the specification guide, with hardware schedule as the note on the parts that break first.

The spares row is easier to defend when it names a model, and the models are on hotel dining chairs.