Craft Notes
Home · Specifying

One room, built first, before 200 chairs

Ten of each model, one room, one week of real service. Cheaper than a change order.

16 Dec 2026 · Specifying
The guide behind thisThe specification guide: how to write a schedule a supplier can price — One line per model, four dimensions, two materials and a finish code. The rest is a drawing, not a sentence.

What it catches

Seat height against the actual table, chair weight against the actual staff, and colour against the actual light. None of the three appears in a sample room with white walls.

The lighting effect alone is in colour sample and dye lot.

How to run it

Ship ten of each model, install one room, run a week of service, then interview the staff. Housekeeping finds the glide and the weight; servers find the footprint.

Mock-up quantities come out of the spares line — see contract dining chairs and quantity and spares line.

What it costs

Ten chairs and a week. Against a change order on 200 chairs it is 4% of the value, and it moves the decision to the point where it is still free.

This is in the specification guide, with sample sign off checklist as the note on what to look at while it runs.

The mock-up room is the cheapest test available, and the models to fill it are on hotel dining chairs.