Two versions of one drawing is a defect waiting

Rev A on the factory floor and Rev B in the buyer's inbox builds the wrong chair, quietly.

17 Dec 2026 · Specifying
The guide behind thisThe specification guide: how to write a schedule a supplier can price — One line per model, four dimensions, two materials and a finish code. The rest is a drawing, not a sentence.

The failure

Rev B changes the seat height by 20 mm. The factory cuts from Rev A because that is what was printed. The first 30 chairs are wrong and nobody notices until installation.

The same class of failure is described in shop drawing versus design drawing, which is where the revision loop lives.

The control

One drawing register, one owner, revisions issued as a full set. Never a partial revision by email, because the email is what gets printed.

Suppliers who run a register are on hotel furniture Foshan, and the check that catches it is in first article inspection.

The freeze

Freeze drawings at PO. After that a change is a change order with a price and a date, and the price is what stops the fifth revision.

This is in the specification guide, with room by room schedule format as the note on the document the register controls.

The register is a factory habit rather than a design one, and it is described on the hotel furniture factory.