Craft Notes
Home · Specifying

Who draws the shop drawing, and why it matters

The design drawing says what it looks like. The shop drawing says how it is made.

17 Dec 2026 · Specifying
The guide behind thisThe specification guide: how to write a schedule a supplier can price — One line per model, four dimensions, two materials and a finish code. The rest is a drawing, not a sentence.

The division

Design: overall size, proportion, finish intent. Shop: sections, joint positions, hardware, machining allowances. The supplier who asks for shop drawings from the designer is asking for the factory's job.

The format question is in drawing format a factory can read.

The approval loop

Supplier issues shop drawings, designer marks them up, supplier reissues. Two rounds is normal; four means the design drawing was not finished.

Suppliers who issue shop drawings as standard are on hotel furniture factory pages, and the internal version is in section views versus renderings.

The signature

The approved shop drawing is the build document. Anything not on it is not built, and anything on it is built even if it is wrong.

This is in the specification guide, with revision control on drawings as the note on the version that gets built.

Every model in the range has a shop drawing already, and the tables are on hotel dining tables.