The roll number is the cheapest insurance in the project

One line on the purchase order, and a re-cover in year three still matches.

14 Dec 2026 · Specifying
The guide behind thisThe specification guide: how to write a schedule a supplier can price — One line per model, four dimensions, two materials and a finish code. The rest is a drawing, not a sentence.

What to record

Roll number, lot, and the metres used per model. roll numbers recorded per order and matched on a re-cover Without it, a re-cover is a different dye lot and it shows.

The approval step before it is in colour sample and dye lot.

Why suppliers do not offer it

It is admin work with no margin. Ask for it as a line on the order confirmation, not as a favour after delivery — once the roll is used, the record is gone.

Orders that carry the record are on hotel dining chairs, and the cover spec that needs it is in fabric and foam specification line.

The spare metreage

Order 10% extra of the same roll and store it. On 120 chairs that is under 2% of the project value and it covers every re-cover in the first five years.

This is in the specification guide, with quantity and spares line as the note on where it goes on the schedule.

The roll record belongs on the same order as the chairs, and the range is on hotel dining chairs.