Two shifts or one, and what it does to quality
A second shift adds capacity and removes the person who was checking. That trade shows up in the batch.
The output question
Running a night shift doubles machine hours and does not double finishing capacity, because the booth needs cure time and a person to watch it.
So a factory on two shifts produces more parts and the same number of finished chairs.
The quality question
Supervision is thinner at night. The first article check is the one that gets skipped, and it is the one that catches a jig that moved two millimetres after lunch.
Frames from a single-shift line are on hotel dining chairs, and the schedule behind them is described under hotel furniture factory.
What to ask
Which stages run at night. Machining at night is fine; finishing and first-article checks are not.
This is in the workshop guide, next to worker skill and training and capacity per month.
Table production follows the same pattern — see hotel dining tables.