A spray booth is a clean room
Dust in the air is dust in the film, and a 0.1 mm speck is visible on a satin top.
What the booth needs
Filtered intake, extraction, a temperature around 20–25 °C and a floor that is cleaned rather than swept. Airborne dust settles into wet lacquer and stays there under every subsequent coat.
Humidity matters too: a water-based system sprayed at 80% relative humidity dries cloudy.
Where dust comes from
Machining next door, cartons stored in the same hall, and the operator's clothing. The factory that sprays in the machining hall can produce a good sample and never a good batch, because the dust is in the air rather than on the part.
Finished frames from a proper booth are on the hotel dining chairs range.
The check
Wipe a top with a dark cloth. Grit that catches is dust in the film, and it cannot be polished out without going through the coat.
This is in the workshop guide, next to sanding and surface prep and finish cure time and shipping.
Panels sprayed in the same booth are under booth seating.