Three suppliers, one schedule, and a decision in ten days

Same schedule to all three, same questions, and score the answers rather than the price.

30 Dec 2026 · Buying
The guide behind thisThe buying guide: quotations, minimums, lead time and inspection — What a furniture quotation is made of, why a minimum exists, what moves a date, and the four documents that decide a claim.

The pack

The schedule in one format, the four claim documents requested, the sample lead time, and the split of the price. Four questions, all answerable in writing.

The schedule format is in schedule columns that matter.

The scoring

Price 40, specification match 30, sample date 15, inspection access 15. The supplier who scores 40 on price and 10 on specification match is the expensive option in year two.

Ranges that match a written schedule are on hotel dining chairs, and the audit access question is in what a factory audit looks for.

The tell

The quote that arrives in two days with no questions means the schedule was not read. The quote with four questions is the one to take seriously.

This is in the buying guide, with quotation comparison as the note on reading what comes back.

The schedule that prices cleanly across three suppliers usually describes a matched package, and those are on table and chair sets.