A second source costs 8% and buys a fallback

Splitting a range across two factories means two colours, two tolerances and two lead times.

29 Dec 2026 · Buying
The guide behind thisThe buying guide: quotations, minimums, lead time and inspection — What a furniture quotation is made of, why a minimum exists, what moves a date, and the four documents that decide a claim.

The costs

Two colour matches, two tolerance regimes, two packing standards, and two sets of spares. On a 200-chair order that is 6–10% more, and on a room it is visible. roll numbers recorded per order and matched on a re-cover

The price comparison itself is in price difference between two quotes.

When it is worth it

When one factory is the only source of a critical model, or when the annual volume needs two lines to hold a date. Not as a habit.

Ranges that cover a whole room from one line are on hotel dining sets, and the alternative supply logic is in currency and price validity.

The version that works

One source for the visible models, a second source for the back-of-house and spare stock. That keeps the rooms consistent and still gives a fallback.