Who keeps the signed sample, and why it decides arguments
Two samples, both signed. One stays at the factory, one on site. A single sample is a dispute.
The two
One retained at the factory as the build reference, one shipped to site as the acceptance reference. Both signed and dated by both parties.
The sign-off list is in sample sign off checklist, and the staging is in frame sample versus full sample.
Why one is not enough
The site sample gets used, cleaned, moved and eventually lost. The factory sample is the one that still looks like the day it was signed, three years later.
Samples produced in pairs come from hotel dining chairs, and the batch check on repeats is in first article inspection.
The photograph
Four angles, daylight, a scale, filed with the PO. It costs ten minutes and it is the only evidence that survives a change of project manager.
This is in the buying guide, with the four claim documents as the note on where it is used.
Two samples are standard on any order above the minimum, and the range is on hotel dining chairs.