Samples run on someone else's queue

A sample room is 9 people serving every buyer at once. Your sample is behind the last one booked.

25 Dec 2026 · Buying
The guide behind thisThe buying guide: quotations, minimums, lead time and inspection — What a furniture quotation is made of, why a minimum exists, what moves a date, and the four documents that decide a claim.

The queue

about 120 in the workshop, 9 in the sample room in the workshop, and the sample room is the bottleneck for everyone. 7–10 days for a frame, 12–15 with cover and finish is the honest number when the room is clear, and 20 days when it is not.

What the sample has to prove is in lead time stages, because a rushed sample is a wasted one.

How to hold the date

Book the sample slot before the PO, not after. The slot in the room is a real commitment; a promise in an email is a queue position.

Slots are booked through the hotel furniture factory in Lecong, and the approval step is in who owns the sample.

The cost of a second sample

Another 15 days and another sample charge. Cheaper than shipping 200 chairs in a colour nobody approved, which is the alternative.

This is in the buying guide, with tooling and sample costs as the note on what it is worth.

The sample room sits in the same building as the line, in hotel furniture Foshan.